25 November 2010
The geothermal air conditioning system for a retail and industrial complex in Milan was experiencing blockages due to severe IRB contamination throughout the system.
" The M&E contractor later reported a doubling of performance on the three worst affected plants with an increased performance across all plants."
Product: BoreSaver Ultra C and BoreSaver Liquid Enhancer
10 June 2010
The Hydraulic barrier well for an industrial site in Falconara was contaminated with algae, calcium carbonate and iron bacteria.
" Following the treatment, pump output achieved 28m3/hr, up from 12m3/hr, an increase of 233%. "
Product: BoreSaver Ultra C Pro and BoreSaver IKL Pro
Page 6 of 6 (27 Articles)