Remediation of a public water supply production borehole contaminated with manganese and/or iron oxide deposits.
" After treatment, the average flow jumped from 16.66l/min to 22.22l/min, a significant increase - that's a SC increase of 1300% !"
Product: BoreSaver Ultra C
Heat exchangers servicing the EDF building at Le Defence were clogged with iron oxide residues, affecting the water flow rate and pump efficiency.
"After treating the system, the M&E contractor reported increased flow, pressure and performance."
Product: BoreSaver Ultra C
The remediation of a well that had been abandoned 3 years previously due to extensive iron oxide and iron bacteria clogging.
" The yield of 4Ml/day was restored and the abandoned borehole was brought back into public supply one week after the treatment."
Product: BoreSaver Ultra C
Rehabilitation of the wells, tunnels and adios at the Brede site facility from iron oxide contamination.
" A GCMS scan, taken after clearance pumping, showed all iron oxide residues had been removed. "
Product: BoreSaver Ultra C and BoreSaver Liquid Enhancer
The Isle of Wight Council, have a problem caused by iron related bacteria in their dewatering siphon wells.
" The Council have used BoreSaver since 2005 and it now forms part of their regular maintenance programme. "
Product: BoreSaver Ultra C and BoreSaver Liquid Enhancer